The exhaust changer, injecting coolingwater into the exhaust pipe was blocked.
Freitag, 25. April 2014
Freitag, 7. März 2014
Donnerstag, 26. September 2013
Maintenance 2013 Valves replacement
In 2013 I replaced all valves and fitting with maritime bronze ones. This long term investment was quite expensive, but sea-valves is one of these things you should not got for standard, but buy best.
Also very important, as bronze is the most noble metal sea-valves are made of, they are safe from electrolysis corrosion between ships. These valves are totally worry free.
Also very important, as bronze is the most noble metal sea-valves are made of, they are safe from electrolysis corrosion between ships. These valves are totally worry free.
![]() |
![]() |
![]() |
| Note, the Anode is fully intact. That proves, taking of the electric landline (if not at home) pays off. |
![]() |
![]() |
![]() |
| the old anode |
![]() |
| Taking out the fittings, cleaning and primer. |
![]() |
![]() |
| Engine room on BB |
![]() |
![]() |
![]() |
| Engine room SB |
![]() |
| Primer the bottom of the keel |
![]() |
![]() |
| I did this for 4 layers! |
![]() |
| cleaning and primer. |
![]() |
| preparing the propeller for antifoulding. |
![]() |
![]() |
![]() |
| new antifoulding |
![]() |
| brand new bronze fittings |
![]() |
![]() |
| propeller with new anodes |
![]() |
| new engine room fittings |
![]() |
![]() |
![]() |
| back to water after 4 days of work. |
Sonntag, 1. September 2013
Maintenance NMEA 2000
Today our ship will make a step forward into a new generation
of electronic systems. I will install a new generation bus system, NMEA 2000.
This bus is quite practical because it interconnects all instruments and
exchanges all information (wind, speed, log, gps, ais, autopilot, and engine
supervision). This is a great advantage (only one cable) and at the same time
its biggest disadvantage. There is absolutely no redundancy. If this bus fails
all instruments, except the plotter fail. The solution is an old fashion Forumo
GPS as backup. Later I have to replace step by step the vdo sl instruments.
Freitag, 26. Juli 2013
Maintenance Electric System 230V
If an electric circuit fails, the troubleshooting can be very time consuming. Basically our installation is well done, but all adds or changes over the last 25 years were badly executed. There is no point in having a box with circuit breakers when things are connected straight to the main service battery.
Here the steps of improvements:
- clean up the existing cabling; remove everything which is not needed.
- replace the connectors, or place the right connectors in case of blank cabling used.
- in long term nothing connected straight to the battery.
A second big step is the 230V circuit. Actually there is only a 230V plug connected to the battery charger and some schuko plugs in parallel. No circuit breaker or emergancy switch. For secutity reasons I don't want to mix up 12V and 230V in the same switching table so I decided to install a new second box.
The 230V switching box should in first order have a main circuit breaker (FI), dedicated fuses for every circuit (charger and some plugs) and a relay to switch between shorepower and the 12/230V onboard converter.